For this reason we can say that, despite the efforts, the project has slowed down a bit, due to the procrastination to obtain the land.
Ethiopia. A Serious Project Brick by Brick Harambee Africa
A school, health center and church are to be built in the next construction phases — all largely by the new inhabitants. At several spots, the groundwater trickles out even in the dry season, which hasn’t been the case in two generations. Bunarest, there is enough water for the new gardens despite the drought. The date has been pushed back repeatedly.